« Back / Horse / Headcollars & Lead Ropes / Lead Ropes

B Vertigo B Vertigo Hardwick Lead

RRP: -31% off
€8.99
RRP: €12.99
Price includes VAT Plus shipping
( 1 )
Colour: Fig Wine Red
Fig Wine Red B Vertigo Hardwick Lead
One size
Horze logo
Shipping by Horze
Free delivery
Free delivery on all orders over 99€
30 days return policy

Description

Pretty lead in soft colours.

Our B Vertigo Hardwick lead is made from durable braided rope. The silver snap hook closes safely. The pretty colours can be easily incorporated into your tack. Combine this lead with the matching V Vertigo Hardwick halter for a full set.

Features:

  • Braided rope
  • Soft colours
  • Silver snap hook

Technical description:

Polyester.

Washing instructions:

Hand wash in cold water.

Product ID: 22637

Read Reviews:

Colour: