Horze Extra Long Lead

€ 9,95
€ 12,95
Price includes VAT
Pink Horze Extra Long Lead horze
Light Blue Horze Extra Long Lead horze
Green Horze Extra Long Lead horze
Dark Red Horze Extra Long Lead horze
Dark Grey Horze Extra Long Lead horze
Size Chart
Your shipping options
Available now. The item is in stock for you
Free Shipping
Free shpping on all orders over 40€
Return & Refund
100 days return policy

Description

An extra long lead for everyday use.


This lead is made from durable braided rope, and equipped with a strong snap hook in satin finish.


Features:


  • Extra long
  • Durable material
  • Big gold-coloured snap hook
  • Various colours

Technical description:


100% Polyester. Length: 2,5m.


Washing instructions:


Rinse in cold water. Air dry.


Product ID: 22621

Read Reviews:

Horze Extra Long Lead